Here's what's listed under the registration of Ibrox Stadium.
Property summary for GLA210958 - ScotLIS - Registers of Scotland
scotlis.ros.gov.uk
Tbf with it being about 2years away i think we'll be lucky to get a commemorative kit
It’s sadly starting to look that way .
Talk of a walkway , memorial garden , proper fanzone , all look pie in the sky now . Two years isn’t enough time to do anything .
be very sad if that was the case.
There hasn’t been so much as a brick laid , nothing . We are 150 years old in two years and a month .
Hopefully get an update at next shareholding meeting.
If Money is required for on field activities, Im sure Club 1872 and other fan groups could start to raise funds.
we own edminston house Im sure.
But it’s too late is my point . Nothing started just now means we won’t see anything finished in time for our 150th . Depressing
But it’s too late is my point . Nothing started just now means we won’t see anything finished in time for our 150th . Depressing
I’m not sure it is in getting everything ready for the 150 celebrations. Planning should be underway at the moment.2 years is quite a long time mate.
Not trying to be argumentative but what couldn't be planned and executed in 2 years?I’m not sure it is in getting everything ready for the 150 celebrations. Planning should be underway at the moment.
I’m not sure it is in getting everything ready for the 150 celebrations. Planning should be underway at the moment.
I’m not sure it is in getting everything ready for the 150 celebrations. Planning should be underway at the moment.
Hopefully something with Edmiston HouseDoes anyone know exactly the land that belongs to us. For example how far back from the copland road and broomloan stand do we actually own? Just thinking what Dave King might be thinking to mark our 150 year anniversary.
The M74 extension was complete in 3 years, but 2 years isn't enough for us to build a walkway at Ibrox?
Unfortunately, that seems to be the case.It’s sadly starting to look that way .
Talk of a walkway , memorial garden , proper fanzone , all look pie in the sky now . Two years isn’t enough time to do anything .
They built the Empire state building in a year !!!But it’s too late is my point . Nothing started just now means we won’t see anything finished in time for our 150th . Depressing
Not if planning permission is required.2 years is quite a long time mate.
They built the Empire state building in a year !!!
They didn't have the planning department and councillors of glasgow city council to deal withThey built the Empire state building in a year !!!
Nothing you mention is major though, a walkway would essentially be repaving and the proposed memorial garden could be built in monthsYou are delusional if you think anything major can now be done within two years . The pace that our board do things ? Give yourself a shake.
There will be no walkway/memorial garden/fanzone or anything similar in place by 2022. Mark this thread and we will come back to it.
Nothing you mention is major though, a walkway would essentially be repaving and the proposed memorial garden could be built in months
How long did planning permission take ? These daft things “ they built a motorway, they built this and that “ have zero relevance ffs.
The fact is we will be lucky if the court case for the memorial garden is done in two years, never mind the actual building of one.
Unless there are already plans signed off and ready that we don’t know about, then nothing will be in place that will properly celebrate our 150th year . We were told we would see several” fitting” improvements in the surrounds of the stadium to fall in line with 2022. We are six weeks from 2020 and all we have is a court case.
How long did planning permission take ? These daft things “ they built a motorway, they built this and that “ have zero relevance ffs.
The fact is we will be lucky if the court case for the memorial garden is done in two years, never mind the actual building of one.
Unless there are already plans signed off and ready that we don’t know about, then nothing will be in place that will properly celebrate our 150th year . We were told we would see several” fitting” improvements in the surrounds of the stadium to fall in line with 2022. We are six weeks from 2020 and all we have is a court case.
Mate, the way things are constructed in the US is years ahead of how it's done here, always has been. They would put a thousand brickies on site if required whereas over here it would be a 4 + 2 squad.lolThey built the Empire state building in a year !!!
That's the spiritBut it’s too late is my point . Nothing started just now means we won’t see anything finished in time for our 150th . Depressing
What spare ground beside the main stand?Wonder what might be happening to the spare ground beside the Main Stand?
What spare ground beside the main stand?
Oh, across from the main stand? Doubt that's owned by RangersThe one next to the Ibrox Football Complex
Oh, across from the main stand? Doubt that's owned by Rangers
Free pies and bovril?Not trying to be argumentative but what couldn't be planned and executed in 2 years?
How true.we own edminston house Im sure. The bit behind the broomloan stand and the broomloan road would make a great purchase. If council owned and our name was Celtic would cost about 1p if we looked after it.