Hardly tarting up the pitch.
Have you seen the nick of it at the Leverkusen game? It needs replaced.
We clearly have budgeted for it but not for the loss of 5 home games, the uncertainty of Coronavirus and the delay in season ticket income.
We're well within our rights to use the Job Retention Scheme for its intended purpose of protecting jobs. That doesn't mean all short and medium term planning goes out the window. The purpose of it is to ensure a successful company comes out the other side.
i did see that the pitch was a mess but that was after about 8 games in 4 weeks during the wettest winter in record. Since that game it has barely rained and there has been no games. Surely with all the manpower we have we should be able to make that pitch better without ripping it up