Supposedly it’s reopening for a few weeks during the COP summit then closing again.Not due to reopen till early October I’m sure
Yep they should have temporary removed the bus lane outside Morrisons a bit further along to help ease the traffic. Of course that would be too obvious thoCorkerhill Road needed to close for essential works, fair enough, but who sanctioned reducing PRW to one lane at Hillington Road South for non essential repairs at the same fucking time?
Where exactly do they start mate out of interest to see how far wall would be?You can park so far up it if your coming up by cardonald college. I park on corker Hill rd just at where the roadworks start. A complete pain in the arse I agree
They start about the entrance to the graveyard going up towards mosspark boulevard if that's any help. I park just about the graveyard entrance and walk up from there.Where exactly do they start mate out of interest to see how far wall would be?
They’re roughly half way up the cemetery.Where exactly do they start mate out of interest to see how far wall would be?
They start about the entrance to the graveyard going up towards mosspark boulevard if that's any help. I park just about the graveyard entrance and walk up from there.
Cheers folks. That's fine for a walk. So is it basically a straight drive up to there if road closed as opposed to lights at it?They’re roughly half way up the cemetery.
They start about the entrance to the graveyard going up towards mosspark boulevard if that's any help. I park just about the graveyard entrance and walk up from there
Hi yes just drive through the lights coming from cardonald college way not mosspark boulevard way (that bit is the closed bit) . It says access only but you can drive up about half wayCheers folks. That's fine for a walk. So is it basically a straight drive up to there if road closed as opposed to lights at it?
Correct , preparations in progress to reopen in time for COP summit in November, all roadworks in Glasgow area to be completed or suspended during the summit, I been working at that site taking away muck etc now we are shipping in type 1 and pea gravel to fill the holes and been told it all to come out again after the summitSupposedly it’s reopening for a few weeks during the COP summit then closing again.
Won't someone think of the carbon footprint?Correct , preparations in progress to reopen in time for COP summit in November, all roadworks in Glasgow area to be completed or suspended during the summit, I been working at that site taking away muck etc now we are shipping in type 1 and pea gravel to fill the holes and been told it all to come out again after the summit
I see wot u did thereWon't someone think of the carbon footprint?